The permanent structures and improvements can be best described at hand of the following:-
Structure: Conventional brick and mortar construction over reinforced concrete
foundations and floor slab and I-beam frame to relevant specifications.
GBA m²: 6 x Warehouses: 1986m²
12 x Offices (double storey): 326m²
Mezzanine Floors: 564m²
Total: 2876m²
Storey: 6 (SIX) Buildings – all double volume with double storey offices in each.
Roof: Corrugated Iron roof sheets fitted onto I-beams.
External Walls: Plastered, concrete and ceramic tiled walls (220 mm)
Internal Walls: Plastered and painted brick walls (110 mm)
Floors: Porcelain tiles, grano floor etc
Ceilings: Variety of concrete, cellotex, softboard
Lightning: Fluorescent boxed and flush ceiling mounted
Glazing: Bronze aluminium windows with clear and obscured glass where
necessary.
Climate Control: None – whirly birds
Security Arrangements: Alarm Systems and secured access control.
Perimeter: Brick Walling
Paving/Interlocking: Large paved areas